28/09/2016
Institution of Mechanical Engineers – South Cumbria

On the 28th September 2016, Gerwyn Tumelty, Tidal Lagoon’s Operations & Maintenance Manager, will update members of the IMechE South Cumbria Area, the ICE and the Professional Engineers South Cumbria (PESC) on the Swansea Bay Tidal Lagoon project. Organised by the IMechE South Cumbria Area Young Members Panel the presentation forms part of the panel’s 2016 Technical Lecture Programme and will be given in The Forum, Barrow-in-Furness.  As the world’s first tidal lagoon, the £1.3 billion Swansea Bay project was granted planning permission in June 2015 with construction scheduled to begin in late 2017. As well as giving an update, Gerwyn will discuss how it establishes a scalable blueprint for a fleet of tidal lagoons in the UK that could meet up to 8% of our electricity demand.

You can read more on the IMechE website here.

Tidal Lagoon Plc

E: Info@tidallagoonpower.com

T: +44 (0)1452 303892

A: Pillar & Lucy House
Merchants Road
The Docks
Gloucester
GL2 5RG

Tidal Lagoon (Swansea Bay) Plc

E: Swansea@tidallagoonpower.com

T: +44 (0)1792 274006

A: 8th Floor
One Central Square
Cardiff
Wales
CF10 1FS

© Tidal Lagoon Plc and Tidal Lagoon (Swansea Bay) Plc. | Designed and Developed by Spindogs