C .3,000MW

Potential installed capacity

C .5,500GWh

Potential power output

C .£8 billion

Potential private capital investment delivered by the project

>3000

Potential jobs sustained at peak construction

>8000

Potential manufacturing jobs created and sustained by the project

£1-2 billion

Potential Welsh Gross Value Added during construction

>£500 million

Potential Welsh Gross Value Added in each year of operation, for 120 years

c.1,000

Potential number of jobs sustained throughout operation

c.100

Potential number of turbines in breakwater

c.70 km²

Potential area of sea enclosed by the breakwater

>800 million m³

Potential volume of water passing through the project’s turbines

>18km

Potential length of the lagoon’s breakwater

Tidal Lagoon Plc

E: Info@tidallagoonpower.com

T: +44 (0)1452 303892

A: Pillar & Lucy House
Merchants Road
The Docks
Gloucester
GL2 5RG
Tidal Lagoon (Swansea Bay) Plc

E: Swansea@tidallagoonpower.com

T: +44 (0)1792 274006

A: Suite 6
J Shed
Kings Road
Swansea
SA1 8PL
© Tidal Lagoon Plc and Tidal Lagoon (Swansea Bay) Plc. | Designed and Developed by Spindogs
http://www.tidallagoonpower.com